Reading time about 20 minutes, workshop 45 to 60 minutes. For club presidents, club disaster coordinators, district disaster teams and the community leaders they work with.
The Rotary Foundation has given RAGCED two mandates: train communities before a disaster, and help restart the economy of affected areas afterwards. RAGCED does not work in immediate relief: other organisations, such as ShelterBox, do that, and the first hours and weeks are covered by the Disaster Field Guide (https://disasterfieldguide.org/). This module sits exactly at the hinge between the two. If a club shifts too late, it keeps distributing aid that the local market could now provide, and it delays the rebuilding of livelihoods. If it shifts too early, families are left without essentials. Knowing when and how to make the shift is the first skill of economic recovery.
Student volunteers rebuild the gutted interior of a flooded house (Princeville, North Carolina, USA, 8 November 1999). Photo: FEMA / Dave Gatley, public domainThe move from emergency response to recovery is not a switch. It is a gradual shift. But you have to recognise it, because the tools, the funding and the skills required change completely.
| # | Indicator | What it means |
|---|---|---|
| 1 | No more rescues needed | Search and rescue is over. Everyone trapped has been located. |
| 2 | Vital needs secured | Water, food and emergency shelter are available to all. |
| 3 | Access restored | Main roads are passable. Outside supply is possible. |
| 4 | Area declared safe | Authorities confirm no immediate hazard remains. |
| 5 | Civil authorities in control | Crisis management is back with normal civil authorities. |
When these five indicators are met, even partially, it is time to change operating mode: from "saving lives" to "rebuilding lives".
Who decides? The club's disaster coordinator, in consultation with the district disaster response officer and the civil authorities. It is never a unilateral decision.
The stabilisation phase (roughly from 72 hours to two weeks) is where community kitchens and distribution points run. The guide gives an objective rule for closing a community kitchen, and it is an economic rule: extending a kitchen beyond need maintains dependency and exhausts volunteers. Close it as soon as two of these three criteria are met:
Announce the closure a few days ahead, direct the remaining vulnerable people to permanent social services, then close and report. The same logic applies to every emergency activity: decide on criteria, not on feeling.
Short-term recovery is the grey zone between emergency and reconstruction. People have water and food but may still sleep under tarpaulins. Roads are open but schools are damaged.
| Action | Who in the club | Possible partners |
|---|---|---|
| Debris removal and clean-up | Project committee | Municipality, local firms |
| Temporary repairs | Trained volunteers | Local firms, ShelterBox |
| Drinking water access | WASH-RAG if activated | UNICEF, water services |
| Return to school | Education committee | Education ministry, NGOs |
| Support to shops and small firms | Economic development committee | Chamber of commerce, microfinance |
| Psychological support | Club health professionals | Local psychologists |
The line "support to shops and small businesses" is where RAGCED's mandate begins. Module 5 shows how to do it without harming the local market.
The guide lists four sources, to be used in this order:
Stopping is as important as starting. Identify the emergency activities that no longer have a reason to exist:
Long-term recovery, from about six months to several years, generally exceeds the capacity of a single club. This is where Global Grants make sense. The district leads the grant, but the club remains the indispensable local partner: without its knowledge of the ground, the project fails.
A Global Grant requires a qualified district and an international partnership. Check the current Terms and Conditions of The Rotary Foundation before planning amounts or deadlines.
The guide lists drinking water systems, disaster-resistant schools, semi-permanent health clinics, earthquake and cyclone resistant shelters, vocational training (construction, agriculture), agricultural recovery (seeds, tools, irrigation), ongoing psychological support and environmental restoration.
The guide describes five recovery projects. What matters here is the role of the local club, the part no one else could have played.
The common feature: the club was not the main implementer. It was the field supervisor, the local connector and the guarantor of quality.

The guide's practical timeline, counted in days from the disaster (D+0), gives the order of magnitude:
| Period | Phase | What happens |
|---|---|---|
| D+0 to D+30 | Emergency response | Direct action, distribution, assessment |
| D+30 to D+90 | Transition | Indicators checked, lasting needs listed, DNA-RAG contacted |
| D+90 to D+270 | Grant preparation | Partner district, participatory assessment, application |
| D+270 to D+450 | Foundation review | Clarifications, approval, agreement |
| D+450 to D+900 | Implementation | Field work, documentation, reports |
| D+900 to D+1000 | Closure | Final report, impact evaluation |
From disaster to grant closure, count two to three years. The CED guide proposes a similar logic for the economy: a first, transitional economic Global Grant to restart the damaged local economy, then a second, structuring one to install lasting mechanisms such as microfinance, cooperatives and restored value chains. Treat these dates as planning estimates, not rules.
Annual rotation of presidents. A Global Grant typically spans three presidencies: the one that launches it, the one that runs it, the one that closes it. If the memory of the project rests on the president of the year, the grant loses coherence at every handover. This is the role of a multi-year disaster coordinator.
Fatigue against expectations. At one month, your club is exhausted. At three months, public attention has moved on. At one year, you may be among the only ones still carrying the subject. The beneficiaries have not forgotten: they measure your reliability over time. Three simple habits help:
Two Rotary Action Groups work on either side of the shift.
DNA-RAG (Disaster Network of Assistance Rotary Action Group) is the Rotary action group dedicated to disaster response. It does not command clubs or districts: it advises, connects, coordinates and equips. In the response phase it activates experts, prevents duplication between clubs and connects international partner districts. Its own description of the recovery phase includes co-developing Global Grants, monitoring projects through local clubs, training local volunteers and documenting lessons learned.
RAGCED is described in the Disaster Field Guide as the action group for community economic development, including post-disaster economic reconstruction: microfinance, vocational training and the recovery of local markets. With its new mandates, it does not enter during relief.
This programme proposes the following division of work, to be agreed between the two groups case by case:
The handover is a conversation, not a transfer of files. The club remains at the centre of both.
Transition review, 45 to 60 minutes. Choose a real or simulated disaster in your area, three weeks after impact.
After running this module in your club, please send your feedback (a pre-filled email), or fill in the feedback sheet in the workshop sheets and send a photo of it. It helps RAGCED improve the programme.